项目管理计划书

p;To:   Finance Street Holding Co. Ltd.
    
    Beijing Shuangyuan Engineering Consultation & Supervision Co. Ltd. Would hereby like to express the sincere thanks to your kind invitation to submit a proposal on the pre-construction stage project management services to the prestige project – B7 Project.
    We are grateful to consolidate all our professional experience including our best human and technical resources to serve this project.  According to our previous experience and ability, we have the confidence in providing the best services to the Client’s satisfaction.
    
    Introduction
    The project B7 is located at the center of the Beijing Finance District, adjacent to West Ring Road 2.  Being a landmark building around the area, B7 shall be developed into a gross floor area of 210,000m2, composing of offices, conference and commercial complex center.  B7 comprises advanced and automatic systems in regard to building management, communication, fire alarm, security and office operation automation (5A); the overall performance and its environment shall meet the international standard offices for financial center.  B7 shall serve its users from local and overseas, well-known financial corporations and their regional headquarters.  The objective of the development shall be end-users’ orientated and in search of the excellence.
    We refer to the Client’s specification and would like to offer our professional project management services to this challenging project from the concept design stage, schematic stage, preliminary stage and the construction working drawing stage; coupled with the tendering and pre-construction statutory procedures.  We shall coordinate the various parties concerned and provide a balancing function throughout the whole project management services.
    In the process of the whole project development, from the design to the construction and the commissioning of the project, we shall make sure of the continuity and the effectiveness of each and individual stages.  The core of the project management concept is the balancing and coordinating of each functional sector.  It is to make sure that the static and dynamic platforms are well integrated and balanced such as to meet the target of time, cost and functional conditions of the Client’s main objectives.
    In this project, Beijing Shangyuan Engineering Consultation & Supervision Co. Ltd. (refer to Appendix) shall work together with (Hong Kong) ValueMark Management Consultants Ltd. (refer to Appendix) as the project management partner.  With the combination of the local construction engineering management experience of Shangyuan and the international management rationale and experience of ValueMark, the project management partner shall even show a synergy of the advantages of each party to serve the Client.  Besides the traditional project management objectives, I.e. quality, time and cost, we shall consider also the up-dated project management concerns, I.e. environmental protection and safety.  We shall inject the management and technical skills like the value engineering, bills of quantities, design buildability, MBO and 5W1H etc. to make sure that there is an added-value service to the Client.  We shall build up a teamwork culture among the various parties like the Client, the design consultants and the prospective contractors etc.  We shall endeavor to extend such culture to the property management stage as well.  With these concepts in mind, we are sure that we can up-grade our professional services in the pre-construction and designing stage to the Client and assure the Client of our international standard services, which may be a benchmark to the project management field.
    The pre-construction stage works, designing and tendering process under our scope of services are briefed as follows:
    
    Part I    Pre-construction Stage Management
    1. The objectives
    To assist the Client in regard to the statutory procedures; to coordinate with various parties in concern in order to make sure that the official commencement of the construction of the project shall be well before end of 2002.
    2. The works
    During this stage, the following statutory departments shall be involved:
    I. Planning Authority
    ii. Building Bureau
    iii. Lands Department
    iv. Construction Bureau including the Tendering Bureau
    v. Other statutory and utility departments: Fire, Mass security, Transportation, Plantation, Water, Electricity, Gas and Heating etc.
    Vi. Design Institutes (SOM and local design institute)
    All the above departments or authorities are integrated and working together.  Their relationship is shown in Appendix by Microsoft Project 2000.
    
    We accord to the requirements as understood, and would aim at the following works:
    I. To prepare a master program for the pre-construction stage for the Client’s reference and approval, and to make sure that all activities are linking in the logical and effective sequences;
    ii. To prepare an investment plan and its cash flow projection for the Client’s approval and budgeting purpose;
    iii. To coordinate with the statutory departments IN ADVANCE to save time and smooth the application procedure;
    iv. To provide pre-construction quasi-legal services and to assist the Client in negotiation and agreement of commercial contracts etc.
   

上一页  [1] [2] [3] [4] [5] [6] 下一页


发表评论】【加入收藏】【告诉好友】【打印此文】【关闭窗口】 点击数:
网友评论

姓 名: *(必填项) ·注册用户·
Email: QQ号:
评 分: 1分 2分 3分 4分 5分
评论
内容
热点
推荐
专题
订阅服务
E周刊
知识
文章精粹
作为一个专注项目管理领域的专业网站,《项目管理时代-E周刊》每周囊括一周内最新的资讯、最新的动态、最新的文章、最新的活动于一身,把握项目管理时代的脉搏,传播思想交流经验。主要包括项目管理资讯、行业动态、图书、资料、论坛热贴、管理文章、各种活动报道。

出版周期:每周 星期三
订阅方式:填写详细的注册信息
遇节假日顺延
版权声明:【站长:德哥 39384591】
本站所有文章及软件部分来自互联网,版权归原作者所有 如果侵犯了您的版权,请联系我们,我们会立刻删除!
Copyright © 2006-2008 项目管理时代. All Rights Reserved